Overall Equipment Effectiveness (OEE) multiplies three ratios: Availability x Performance x Quality. It is simple, but teams often double-count losses. Here is one shift worked through.

The shift

  • Planned production time: 480 min, unplanned stops 47 min, so run time is 433 min.
  • Ideal cycle time: 1.0 s per part; total count 19,271 parts; good parts 18,848.

The three ratios

  1. Availability = run time / planned time = 433 / 480 = 90.2%.
  2. Performance = (ideal cycle x total count) / run time = 19,271 s / 25,980 s = 74.2%.
  3. Quality = good / total = 18,848 / 19,271 = 97.8%.

OEE = 0.902 x 0.742 x 0.978 = 65.5%.

Common mistakes

  • Counting a changeover as a performance loss and a stop.
  • Using the nameplate speed instead of the proven ideal cycle time.
  • Reporting OEE without the three factors: a 65% line can have very different problems.

Check your own numbers

A free in-browser OEE calculator runs this sum for you. For the wider picture of how a plant floor is organised, see the ebook Understanding the Shop Floor by Yunus Emre Vurgun.