Overall Equipment Effectiveness (OEE) multiplies three ratios: Availability x Performance x Quality. It is simple, but teams often double-count losses. Here is one shift worked through.
The shift
- Planned production time: 480 min, unplanned stops 47 min, so run time is 433 min.
- Ideal cycle time: 1.0 s per part; total count 19,271 parts; good parts 18,848.
The three ratios
- Availability = run time / planned time = 433 / 480 = 90.2%.
- Performance = (ideal cycle x total count) / run time = 19,271 s / 25,980 s = 74.2%.
- Quality = good / total = 18,848 / 19,271 = 97.8%.
OEE = 0.902 x 0.742 x 0.978 = 65.5%.
Common mistakes
- Counting a changeover as a performance loss and a stop.
- Using the nameplate speed instead of the proven ideal cycle time.
- Reporting OEE without the three factors: a 65% line can have very different problems.
Check your own numbers
A free in-browser OEE calculator runs this sum for you. For the wider picture of how a plant floor is organised, see the ebook Understanding the Shop Floor by Yunus Emre Vurgun.